Location
Javascript is required to view this map.
Get Updates
Start Date: TBD
Estimated Completion: TBD
10th Street
Lower TrackThe existing track passes beneath 10th Street. This track lowering will occur in conjunction with two other adjacent sites (12th Street and the 1-395 Ramp) that also require additional vertical clearance. These sites are located to the railroad south of the 10th Street project.